This project was at an apartment building that required several repairs:
1. Remove existing Crown boiler, gas line, flue pipes, pumps and heating pipes.
2. Install a Weil-McLain Ultra 299 modulating/condensing gas boiler.
3. Installation includes PVC venting and fresh air intake, primary/secondary piping, flow check valve, primary pump, secondary pump, isolation, balance and purge valves.
4. Install a new expansion tank, feeder, backflow preventer, and air eliminator.
5. Install manual reset high limit and manual reset low water cut off in header above boiler
6. Install taps off boiler header for future indirect hot water heater.
7. All power and control wiring
8. Start up, test, program and balance system.